man power required for erection of steam boiler
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
The boiler has a main steam flow rate of 3,226t/h, while the superheater has an outlet steam pressure of 282barg at a reheating temperature of 600°C. The plant uses STF 100 steam turbines with one high-pressure, one intermediate and two low-pressure turbines along with a two-pole gigatop hydrogen-cooling technology, using turbo generator for Get Price
Jan 27, 2010 · Steam power plant consisting of (1) Double cylinder double acting steam engine 15 hp, each cylinder dia 4″xstroke 4″, complete with reverse mechanism, hand lubricating pump for cylinder lubrication, drip lubricator for crosshead lubrication and 12″ pulley (2) Water tube Yarrow type boiler suitable for biomass firing with 140 sq ft heating Get Price
The boiler has a main steam flow rate of 3,226t/h, while the superheater has an outlet steam pressure of 282barg at a reheating temperature of 600°C. The plant uses STF 100 steam turbines with one high-pressure, one intermediate and two low-pressure turbines along with a two-pole gigatop hydrogen-cooling technology, using turbo generator for Get Price
Aug 30, 2017 · This procedure defines the requirement and procedure of hydrostatic testing of the boiler pressure parts after completing the assembly of all the boiler high pressure and temperature components. Hydrostatic testing Objective Hydrostatic testing in the boiler is carried out to check the following: Leakages in the boiler pressure parts (Tubes, headers and Pipes).Get Price
Provides accident insurance for boilers and pressure vessels that are normally used in steam power stations and factories, covering the risk of explosion and …Get Price
The erection of Benson boiler is easier and quicker. 25. Write about Loeffler boiler? Since the fan handles cold air, the fan size and the power required are less. The automatic man control provided at a steam power plant successfully meets over the variable load. The automatic control for feed water is necessary sine the supply of Get Price
The erection of Benson boiler is easier and quicker. 25. Write about Loeffler boiler? Since the fan handles cold air, the fan size and the power required are less. The automatic man control provided at a steam power plant successfully meets over the variable load. The automatic control for feed water is necessary sine the supply of Get Price
Aug 30, 2017 · This procedure defines the requirement and procedure of hydrostatic testing of the boiler pressure parts after completing the assembly of all the boiler high pressure and temperature components. Hydrostatic testing Objective Hydrostatic testing in the boiler is carried out to check the following: Leakages in the boiler pressure parts (Tubes, headers and Pipes).Get Price
Jan 27, 2010 · Steam power plant consisting of (1) Double cylinder double acting steam engine 15 hp, each cylinder dia 4″xstroke 4″, complete with reverse mechanism, hand lubricating pump for cylinder lubrication, drip lubricator for crosshead lubrication and 12″ pulley (2) Water tube Yarrow type boiler suitable for biomass firing with 140 sq ft heating Get Price