Horizontal Multistage Steam Boiler Inspection
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
(c) steam boilers, steam and feed-pipes and their fittings coining under the purview of Indian Boilers Act, 1923 ; (d) metal bottles or cylinders used for storage or transport of compressed gases or liquified or dissolved gases under pressure covered by the Gas Cylinder Rules, 1940 framed under the Indian Explosives Act, 1884;Get Price
A review of the methods of industrial water treatment and the fundamentals of industrial water pollution control. Topics include: water budgets, cooling tower and boiler treatment, corrosion control, government regulations, wastewater characterization, waste minimization, pilot plants, pretreatment, final treatment, and site selection.Get Price
Industrial Boilerhouse Supplies Ltd, IBHS, stock and supply a full range of industrial and commercial boiler and steam boiler parts and cleaning equipment.Get Price
Sep 05, 2017 · The boiler diagram below works by heating the central heating water and pumping it around to the diverter valve. This is then diverted from the central heating circuit to go into the water to the heat exchanger where it passes the heat from the central heating water to the cold water coming into the boiler. 29.Get Price
The off-gas at a rate of 66,000 Nm3/h leaves the afterburner chamber at a temperature of 1000°C. Heat is recovered in a steam boiler. The gases leave the boiler at 270°C. Steam is generated at 25 atm and superheated to 250°C at a rate of 34 t/h. A steam turbine generates electric power at the rate of 1320 kw/h consuming 22 t/h steam.Get Price
Industrial Boilerhouse Supplies Ltd, IBHS, stock and supply a full range of industrial and commercial boiler and steam boiler parts and cleaning equipment.Get Price
Concentration takes place in one pass, without recirculation of the juice. The T.A.S.T.E is built as a multieffect evaporator, usually with four or five effects. With four effects, 3.3 kg of water can be evaporated with 1 kg of boiler steam. Before entering the first stage, the feed is usually preheated in a tubular heat exchanger.Get Price
Concentration takes place in one pass, without recirculation of the juice. The T.A.S.T.E is built as a multieffect evaporator, usually with four or five effects. With four effects, 3.3 kg of water can be evaporated with 1 kg of boiler steam. Before entering the first stage, the feed is usually preheated in a tubular heat exchanger.Get Price
Sep 05, 2017 · The boiler diagram below works by heating the central heating water and pumping it around to the diverter valve. This is then diverted from the central heating circuit to go into the water to the heat exchanger where it passes the heat from the central heating water to the cold water coming into the boiler. 29.Get Price