Detailed Specification Of 2 Ton Gas Boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :Detailed Specification Of 2 Ton Gas Boiler
  • Supply Capacity : 10 units/month :Detailed Specification Of 2 Ton Gas Boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • B17 Steam Locomotive Trust - Construction Progress

    Boiler Specification. In keeping with the Engineering Plan for the project the Design Requirement is now being sent out to specialist potential suppliers. The requirement is for a Diagram 100A boiler as fitted to the B1s and retro-fitted to the B17s.Get Price

  • GA - GAC

    2. Fly ash, bottom ash, boiler slag, and flue gas desulfurization materials, generated primarily from the combustion of fuels (including other fossil fuels) other than coal, for the purpose of generating electricity unless the fuel burned consists of more than fifty percent (50%) coal on a total heat input or mass input basis, whichever results Get Price

  • GA - GAC

    2. Fly ash, bottom ash, boiler slag, and flue gas desulfurization materials, generated primarily from the combustion of fuels (including other fossil fuels) other than coal, for the purpose of generating electricity unless the fuel burned consists of more than fifty percent (50%) coal on a total heat input or mass input basis, whichever results Get Price

  • Solution Manual Of Engineering Economy 16th Ed by William

    boiler (1.2) and boiler support system (1.3) cost $110. million. The cost index for boilers was 110 in 1993, it is 492 in 2016. The cost capacity factor for similar. boilers and support systems is 0.9. The 600-acre site. is on property you already own, but improvements. and roads (1.1.2) will cost $2,000 per acre, TABLE P3-26 Table for Problem 3-26Get Price

  • Direct-Reduced Iron - an overview | ScienceDirect Topics

    Jan 05, 2012 · The recirculated off gas is used for fluidisation of the solids in the reactors. Primarily, reduction occurs with carbon monoxide: Fe. O 3 + 3 CO = 2Fe + 3CO 2. After heat recovery in a boiler, the de-dusted, quenched and CO 2 …Get Price

  • B17 Steam Locomotive Trust - Construction Progress

    Boiler Specification. In keeping with the Engineering Plan for the project the Design Requirement is now being sent out to specialist potential suppliers. The requirement is for a Diagram 100A boiler as fitted to the B1s and retro-fitted to the B17s.Get Price

Discount
7X24 Online