Unit Boilers Silver Refinery Input And Output
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
(1) Except as provided by paragraphs (b)(2),, and of this section, the standards of this part do not apply to a new hazardous waste boiler or industrial furnace unit that becomes subject to RCRA permit requirements after October 12, 2005; or no longer apply when an owner or operator of an existing hazardous waste boiler or industrial furnace Get Price
SlimFit Commercial Condensing Gas Boiler. 550 - 2000 MBH (5 Sizes) SlimFit 750 — Richer Elementary School, Marlborough, MA (1.52 MB) SlimFit 750 — U.S. Army Reserve Center (775.45 KB) Drawings. SlimFit 1000 Heat Exchanger Section Only …Get Price
Available in 5 condensing models with outputs (@50/30°C) of 70, 95, 110, 140 and 180 kW.Recently updated cast iron condensing, fully modulating, pre-mix gas fired commercial boiler.Get Price
FTVN Series. The FTVN is a high efficiency, wall hung boiler using a durable, vertical down-fired stainless heat exchanger. With 10:1 modulation and 96% AFU, an integrated ECM pump and DHW diverter, quick connect components, WIFI connectivity for remote monitoring and alert notifications, the FTVN is an ideal solution for your 'peace of mind', home heating needs.Get Price
Whether as a pure backup fuel for a production facility, school, hospital or other critical application or to obtain much better utility rates through an interruptible rate agreement, your boiler system must be ready to quickly change fuel sources.Get Price
(1) Except as provided by paragraphs (b)(2),, and of this section, the standards of this part do not apply to a new hazardous waste boiler or industrial furnace unit that becomes subject to RCRA permit requirements after October 12, 2005; or no longer apply when an owner or operator of an existing hazardous waste boiler or industrial furnace Get Price