general constructional details of a fire tube boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :general constructional details of a fire tube boiler
  • Supply Capacity : 10 units/month :general constructional details of a fire tube boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Indian Boilers Regulations - 1950

    General Requirements, Applications of Standard Conditions and Expectations thereto: Reg.3A: Inspection of Boiler to comply into any foreign code: Reg.4: Standard Requirements-Material, Construction, Inspecting Authority's Certificates and Maker's Stamp: Reg.4AGet Price

  • Neufert 4th Edition | PDF | Elevator | Roof

    ~ gas room heater for external wall Paper formats change of cross-section Technical)( (stating nominal diameter) connection (stating connection appliance capacity volume flow capacity) (kW) (m 3/h) drawings rn'ln Layout of gas water 8.8-28.1 1.14-3.62 drawings gas pipe house entry heater Construction gas heating boiler circulating 9.5-28.4 1.23 Get Price

  • Ships Electrical Standards (2018) - TP 127 E

    any oil-fired boiler or oil fuel unit; "main fire control station" refers to a control station in which the control and indication functions for the fire detection and alarm system, fire door indicator and control panel, water tight door controls and indication, general alarm, public address, telephone systems and accommodation and vehicular Get Price

  • Indian Boilers Regulations - 1950

    General Requirements, Applications of Standard Conditions and Expectations thereto: Reg.3A: Inspection of Boiler to comply into any foreign code: Reg.4: Standard Requirements-Material, Construction, Inspecting Authority's Certificates and Maker's Stamp: Reg.4AGet Price

  • Ships Electrical Standards (2018) - TP 127 E

    any oil-fired boiler or oil fuel unit; "main fire control station" refers to a control station in which the control and indication functions for the fire detection and alarm system, fire door indicator and control panel, water tight door controls and indication, general alarm, public address, telephone systems and accommodation and vehicular Get Price

  • Indian Boilers Regulations - 1950

    General Requirements, Applications of Standard Conditions and Expectations thereto: Reg.3A: Inspection of Boiler to comply into any foreign code: Reg.4: Standard Requirements-Material, Construction, Inspecting Authority's Certificates and Maker's Stamp: Reg.4AGet Price

  • Ships Electrical Standards (2018) - TP 127 E

    any oil-fired boiler or oil fuel unit; "main fire control station" refers to a control station in which the control and indication functions for the fire detection and alarm system, fire door indicator and control panel, water tight door controls and indication, general alarm, public address, telephone systems and accommodation and vehicular Get Price

  • Neufert 4th Edition | PDF | Elevator | Roof

    ~ gas room heater for external wall Paper formats change of cross-section Technical)( (stating nominal diameter) connection (stating connection appliance capacity volume flow capacity) (kW) (m 3/h) drawings rn'ln Layout of gas water 8.8-28.1 1.14-3.62 drawings gas pipe house entry heater Construction gas heating boiler circulating 9.5-28.4 1.23 Get Price

  • Neufert 4th Edition | PDF | Elevator | Roof

    ~ gas room heater for external wall Paper formats change of cross-section Technical)( (stating nominal diameter) connection (stating connection appliance capacity volume flow capacity) (kW) (m 3/h) drawings rn'ln Layout of gas water 8.8-28.1 1.14-3.62 drawings gas pipe house entry heater Construction gas heating boiler circulating 9.5-28.4 1.23 Get Price

Discount
7X24 Online