160 Tph Boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :160 Tph Boiler
  • Supply Capacity : 10 units/month :160 Tph Boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • DSR 2021 Vol I English Dir | PDF | Construction Aggregate

    0001 Hire charges of Coaltar Boiler 900 to 1400 Air compressor hour 200.00 0059 Wet Mix Plant 60 TPH hour day 40000.00 0088 Hire charges of Drill machine upto 30 mm dia day 160.00 0089 Hire charges of sand blasting equipment Get Price

  • Boiler – Fundamentals and Best Practices

    Steam Production From steam tables we can see that the total heat of steam does not vary a great deal as the boiler pressure increase The boiling point (b.p.) increases as the pressure increases Thus the sensible heat increases as the pressure increases, and the latent heat decreases Boiler pressures are expressed in psia, psig, bar, kg/cm2 Get Price

  • Power plant and calculations: Boiler calculations for

    Feb 12, 2021 · 17-A 200 TPH boiler generates 190 TPH (Q1) steam at pressure 121 kg/cm2 and temperature 550 deg C & consumes 31 TPH of coal having GCV 5200 kcal/kg. Calculate the Boiler efficiency if it requires 25 TPH (Q3) attemperator water at temperature 125 deg C. Consider feed water temperature at economizer inlet is 210 deg C & ignore blow down loss.Get Price

  • DSR 2021 Vol I English Dir | PDF | Construction Aggregate

    0001 Hire charges of Coaltar Boiler 900 to 1400 Air compressor hour 200.00 0059 Wet Mix Plant 60 TPH hour day 40000.00 0088 Hire charges of Drill machine upto 30 mm dia day 160.00 0089 Hire charges of sand blasting equipment Get Price

  • INTRODUCTION TO BOILER - 123seminarsonly.com

    INTRODUCTION TO BOILER A boiler is a closed vessel in which water or other fluid is heated. The heated or vaporized fluid of the boiler for use in various processes or heating applications Types of Boilers: Based on Principle of Working: 1. Fire tube …Get Price

  • DSR 2021 Vol I English Dir | PDF | Construction Aggregate

    0001 Hire charges of Coaltar Boiler 900 to 1400 Air compressor hour 200.00 0059 Wet Mix Plant 60 TPH hour day 40000.00 0088 Hire charges of Drill machine upto 30 mm dia day 160.00 0089 Hire charges of sand blasting equipment Get Price

  • BILL OF QUANTITIES FOR ROAD WORKS

    prepared in Drum type Hot Mix Plant of 60-90 TPH capacity 300.00 Cum 8 Providing and laying seal coat over prepared surface of road with bitumen heated in bitumen boiler fitted with the spray set spraying using 98 kg of bitumen of grade VG - 10 and blinding surface with 0.90 cum of stone aggregate of 6.7 mm size (Passing 11.2 mm sieve and Get Price

  • GHIRARDELLI 60% Cacao Bittersweet Chocolate Premium Baking

    Stovetop - From Ambient **Chocolate Melting Instructions **Place chips in double boiler over gently simmering (not boiling) water. Stir chips constantly until melted. **Microwave - From Ambient **Chocolate Melting Instructions **Heat chocolate in a microwave safe container at medium power (50%) for 1 to 1 1/2 minutes.Get Price

  • Combustion Evaluation: Sources and Control Devices

    Some typical excess air levels in various types of equipment (at zero or minimum smoke) Type /&_ Home Heat Apartment House Boiler Ship's Boiler 60 MW Power Station Heat Input to Furnace -,168 Btu/hr 0.18 2.2 80 600 Excess Air % 40 27 15 3 C0,% 11 13 14 15.7 L.- Table 3.Get Price

  • WAC 296-200A-016

    :(4) "Boiler, steam fitting, process piping"— A contractor in this specialty installs, services and repairs power boiler installations and hot water heating systems, including fire-tube and water-tube steel power boilers and hot water heating low pressure boilers, steam fitting and piping, fittings, valves, gauges, pumps, radiators, convectors, hydraulics, fuel oil tanks and fuel oil lines.Get Price

Discount
7X24 Online